Barns and Buildings

Since 1970, We are your Nationwide custom builders of barns & buildings. Request a Quote :: 832-794-2812

Barns and Buildings

Western Barn Homes

The Western Raised Center Barn Home


Let us design your dream home



Below is a brief summary of our inclusion.

1. Designate the location of barn with owner.
2. Equipment, Tools, Labor and Materials. (No hidden cost)
3. Grading of building pad.
4. Complete Post & lumber package delivered to site.
5. Erecting/Building barn structure on site.
6. Cedar or Poplar Siding in L & G or Channel Rustic style. (Bat on Board
style and Lap are other siding style options)
7. Cedar or Poplar Trim in 1x8, 1x6 and 1x4.
8. Roofing: 40yr Master Rib Metal roofing system. (Color as per owner.)
9. Concrete delivered poured and finished.
10. Custom built Split wood Slider doors, Dutch doors, Dutch windows and
Stalls.
11. 2x6 (select grade) Pine T&G
12. Windows are Low e and insulated along with insulation.
13. HVAC, plumbing and electrical.
14. Custom built stairway.
15. Custom rustic wood flooring.
16. Clean building area of debris.
17. Permit by Others.
18. ENJOY!!

All of our lumber is Kiln dried # 2 or better and Poles are ACQ treated.
We are the builders and your barn will be built, ready for use, in approx 6-8
weeks from start to finish (pending on weather).
Draws are 5 payments throughout the course of building the structure.
























Columbus Texas Barn Home




We got in touch with our previous contractor, but it turns out he is going bankrupt and is unable to complete the project. As you can see form the photos, we still need the 333 foot gravel road done, the garage door, the two stable doors (one has a temp wall for a workshop), finalizing the electric, and the 99 linear feet of 2' 7" rock border around the base of the barn and on the breezeway. If you could provide an itemized estimate of the remaining work, I would greatly appreciate it. I have also asked another local contractor, but he is unfamiliar with horse barns so I am a bit leery of his work. Thanks again for your patience. Should have gone with you guys in March.

Someone that went with a contractor
Anonymous